Customization: | Available |
---|---|
After-sales Service: | Outside Engineer Service |
Warranty: | Outside Engineer Service |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This machine takes galvanized steel or cold rolled steel as the raw materials,
through a series of steps to form it into a shelving profile with a specific shape and size.
The forming steps devices include decoiler, Feeding, and Leveling Devices,
Hydraulic Punching device, main forming mill, hydraulic post-cutter.
The inverter controls the motor speed, the PLC system controls length and quantity automatically,
therefore, the machine achieves continuous automatic production,
which is the ideal equipment for the cold roll forming industry.
Model
|
Horizontal shaft O.D
|
Vertical shaft O.D.
|
Tube Range
|
Thickness
|
Drive Motor
|
Dimension
|
YT-S40
|
40mm
|
25mm
|
∅8-51mm
|
0.3-2.2mm
|
7.5kw+7.5kw
|
21.5m*1.1m
|
YT-S50
|
50mm
|
30mm
|
∅25-76mm
|
0.4-2.5mm
|
11kw+7.5kw
|
24m*1.2m
|
YT-S60
|
60mm
|
40mm
|
∅50-114mm
|
0.5-3.0mm
|
15kw+15kw
|
26m*1.4m
|
YT-S80
|
80mm
|
50mm
|
∅89-168mm
|
0.8-4.0mm
|
18.5 kw+18.5 kw
|
32m*2.3m
|
YT-S100
|
100mm
|
60mm
|
∅114-219mm
|
1.0-6.0mm
|
22 kw+22kw
|
36m*2.5m
|
YT-S120
|
120mm
|
80mm
|
∅168-325mm
|
1.5-8.0mm
|
37 kw+37kw
|
40m*3.0m
|
Support For Customizing Orders
|
Rack Upright Roll Forming Machine Technical Description of Different Parts:
1) Rack upright roll forming machine Feeding and Leveling device
Brand: BMS Original: China
7 rollers (up 3/down 4), for straightening the material.
FAQ
Q: Are you a factory or trading company?
A: We are a factory which has been producing stamping automation machines for more than 20 years.
Q: What's the delivery time?
A: The standard machine is 25 to 30 working days after payment. For compact coil feed lines or whole metal stamping lines, it needs 30-70 workdays depends on different specifications and production plan in our factory,we will confirm the delivery time based on the specific project itself.
Q: Do you receive OEM or ODM?
A: Yes, we warmly welcome customers to do OEM and ODM in our factory.
Q:What's warranty time of your machine?
A:Usually the warranty time is 12 months. Also the warranty time can be extend acorrding the specific requirements.
Q:What after-sales service does YITUO provide?
A:For the standard decoiler straightener feeder machine, it's easy to install and debug it, most of our customers can do it by themselves; And what's more, our technical engineer can teach your operators how to install and operate it.
For the compact coil feed machine and complete metal stamping line,YITUO can arrange engineers to go overseas for the coil handling equipment installation. They guide the customer's operators on-site.
Q: What information you need to prepare the quotation:
1. Coil thickness (min-max)
2. Coil Inner and Outer diameter (min-max)
3. What kind of your material
4. Weight of your coils (max)
5. How many tons you need per day or per month